Q:
Why outsource?
A: Low initial investment, high quality and a typical savings of 20%
to 60%.
Q:
How long should a quotation take?
A: Depending on whether the product is quoted from a drawing or a
sample, the length of time for the quotation is approximately two weeks.
Q:
Do I need a large order to make sourcing financially viable?
A: The size of the order and the production method required will what
size order will be cost effective. Since tooling costs vary with each
process and will affect the per-unit cost, a precise cost analysis for a
specific part can only be obtained by requesting an actual quotation.
Q:
What can I expect for delivery time?
A: Again this depends on the type of manufacturing and the tooling
involved. For metal casting, depending on size, tooling generally is
produced in less than a month. At that time a sample will be supplied to
for your approval. Once tooling is approved, the product should be ready
to ship in 4 to 5 weeks.
Q:
What costs are involved?
A: Contracts are decided on the CIF price. The CIF price includes
manufacturing and fees in the country of the manufacturer plus freight
(air or sea) to the port of your choice. Other charges would include
services of a custom broker (if you do not have one), broker fees, custom
and bond fees, document destination charges at the port, and freight
charges from the port to your location of choice. |